Grab Bar Installation in North Wilmington, DE

  • Soaking Tub and Shower Planned Together
  • Seated and Standing Entry Planned
  • Three Bars for $600

Say whether the tub, the shower, or both get used.

Grab bar above a soaking tub deck in a North Wilmington, DE primary bath by Precision Home Worx
Grab Bar Installation project by Precision Home Worx near North Wilmington, DE
Finished grab bar installation work by Precision Home Worx

A primary bath with a deep tub and a separate shower has two places where a wet foot meets a hard surface, and each requires different care. Getting into the tub means climbing over a wide ledge and lowering into deep water. Getting into the shower means stepping over the threshold and having a hand free to reach the valve.

Both wet areas and the toilet in a North Wilmington primary suite are measured before any bar is chosen, so each spot is set with the others in view.

Call or text Jimmy at (302) 321-3577, Monday through Sunday, 7 a.m. to 8 p.m.

Why Homeowners Trust Us With the Bars in Their Bath

In the trade since 1985Jimmy Grubb has worked in residential carpentry and remodeling for more than 40 years.
Insured & bondedDelaware business license #223872998, general liability insurance, RLI surety bond.
BBB A+ accreditedAccredited with the Better Business Bureau since 2023.
Google 5.0 ratedRated 5.0 by our customers on Google.
One-year warrantyWorkmanship warranty on every job, dated from completion.
Family-ownedJimmy and his son, residential work only.

Five spots, your order

You choose which bars go up first and which can wait.

Clear of the glass and the spout

Bars are placed with the door swing and the tub filler in mind.

A bar for the toilet as well

The same visit covers the side wall beside the seat.

Bars for the Tub Deck and the Shower Stall

Soaking tub and separate shower in a North Wilmington primary suite

Country Gates went up in the early 1990s, and a primary suite there can pair a large soaking tub with a separate shower. Wherever a suite has both fixtures, the bath has two wet zones.

A tub entry bar, a bar along the tub wall, a bar at the shower entry, one by the shower valve, and one beside the toilet come to five, which is past the three that the $600 price covers. Jimmy works out with you which spots matter first and which can wait.

Climbing into a drop-in tub

A drop-in soaking tub sits on a framed, tiled platform, so the person has to clear the width of the ledge as well as the height of the tub wall. One way in is to sit on the edge of the deck and swing the legs over. A bar for that move sits on the wall within reach of a seated hand. For someone who steps in while standing, a vertical bar at the step-in end lets a hand stay on the wall throughout the motion. A bar on the deck itself is an option Jimmy talks through at the visit, since it needs solid blocking under the tile. The tub filler and its handles matter too, so the bar is set clear of the spout.

At the shower threshold and the valve

A separate shower has a curb to step over, and the entry bar goes on the framed wall beside the glass. Inside, a horizontal bar near the valve gives a hand something firm to hold while the other hand adjusts the water. Where the stall has a built-in seat, a bar beside it helps with standing up. A handheld shower on a slide bar is a separate fixture, and a slide bar is made to hold a shower head, so a grab bar goes up beside it. A bar placed out of the direct spray stays easier to grip than one the water runs over.

Pricing a Tub-and-Shower Suite

  • Item

    First three grab bars

    Cost$600
  • Item

    Bars four and up

    CostSet at the estimate
  • Item

    Taller toilet swap (comfort height)

    Cost$800

In a suite with both a tub and a shower, the count runs past three. If you choose a deck-side bar, the tub deck is what sets the figure from there. Where the deck has an access panel, blocking for a deck-side bar can be set from underneath. Where it has none, reaching the framing means lifting the tile, and Jimmy prices that based on what he finds under the deck.

Jimmy prices every project in person at your home, never from a photo or a text. Project estimates are free and are usually scheduled in the evening.

Our warranty

Our work carries a one-year workmanship warranty, dated from the day the job is finished.

How the Install Comes Together

1

Name the suite and who bathes there

Call or text with the bathroom in question and who needs the bars.

2

Jimmy stands in each zone

At the estimate, he looks at how the tub deck is built, what the shower walls are made of, and where the glass sits, and he marks where each bar can be fastened.

3

The written price

Jimmy looks it over in person, and the written price follows. Which bars go up first and which can wait for a later visit are agreed before install day.

4

Install with the tub covered

The tub and shower floor are covered before any drilling, and the bars are installed in the order you agreed.

Where Each Bar Goes in the Primary Bath

Part of the jobWhat we doWorth knowing
The first three barsPicked with you from the five spotsCovered by the three-bar price
Bars past threeAdded in the order you choosePriced at the estimate
Framing behind each barFound before drilling, with blocking where no stud lines upCan mean lifting a tile
A toilet in its own compartmentA bar on one side wall or on bothBoth walls sit within reach
A taller toiletAvailable as a separate toilet replacementShown in the price table above
Bars you bought yourselfPut up if they suit the wall and the spotOur warranty then covers the labor

Walls, ceilings and trim are not something we paint, so a patched wall comes back unpainted.

Primary Bath Grab Bar Questions

They do not have to, but matching the finish to the faucets keeps the room looking planned. Keeping the same bar diameter in both zones also means a hand meets the same grip wherever it reaches.

It looks tidier when a flange sits centered on a tile, but the bar's spot follows the stud or the blocking first. Where the two disagree, the framing wins and the look comes second.

Bars come in a range of lengths. The one on the long tub wall is sized to span from where a hand lands while the person sits down to where it lands as they rise.

Old or brittle tile can chip at a drill hole. Jimmy looks at the tile at the visit and tells you if a spot is a risk, and a different spot or a spare tile is worked out before anything is drilled.

Only where the two sit side by side on a shared wall. A vertical bar on that wall can steady a hand stepping out of one and into the other, but the reach has to suit both entries, which is checked at the visit.

Take the bottles off the tub deck and the shower shelves, and move anything stored under the spots where bars will go. The vanity and the rest of the room can stay as they are. If a taller toilet is going in on the same visit, clear the floor around the old one too.

Google Reviews for Our Grab Bar Installs

More reviews from our customers, straight from Google.

Grab Bars for Your North Wilmington Primary Bath

Mention whether anyone sits on the tub deck to swing in. That detail sets where the tub bars go, and Jimmy plans the shower and the toilet around them.

Precision Home Worx · Based in Claymont, DE · (302) 321-3577 (call or text) · Monday through Sunday, 7 a.m. to 8 p.m.

Delaware business license #223872998 · General liability insurance and RLI surety bond #LMS1971327

Serving Wilmington, Claymont, North Wilmington, Hockessin, Pike Creek, Greenville, Newark, New Castle, Bear and the rest of northern Delaware.